Milestone Leakage Routemap to revolutionise the reduction of leakage from pipes
Date published:
March 18, 2022

Milestone Leakage Routemap to revolutionise the reduction of leakage from pipes
- Routemap to be launched at 22nd Annual Leakage Conference in Birmingham
- It outlines how water companies will triple leakage reduction by 2030 and halve leakage by 2050
- Leakage across the network at lowest levels since records began following significant investment and innovation by industry
- Further progress – alongside new water transfers, reservoirs, and water efficiency – essential for avoiding drought mid-century and reducing abstraction from rivers
- Water companies are also calling on Government and regulators to support more replacement of old pipes, to match European replacement rates
Water companies in England have today published a landmark report which sets out how they plan to significantly reduce leakage by 2050.The ambitious Leakage Routemap 2050 provides a framework for companies to meet their commitment to triple the rate of leakage reduction by 2030 and halve leakage by 2050. The 2030 target was set out in the 2019 Public Interest Commitment while the 2050 pledge has been endorsed by the National Infrastructure Committee.Read the full article
More from the water sector
Find out how the UK water sector is informing, innovating, and influencing change
Future Water Awards 2026 – Nominations now open
Celebrate excellence in the UK water sector by nominating outstanding individuals and organisations for the 2026 Future Water Awards, recognising emerging talent, people, and above-and-beyond contributions.
CEO Blog: Turning climate anxiety into infrastructure action
For most industries, June's World Environment Day was a prompt for climate action. For water, it was a reminder that we already are acting - and that it still isn't enough.The question isn't whether the climate is changing. That's obvious. The question is: how do we turn climate anxiety into operational readiness, and keep clean, safe water flowing in an environment that is making it harder to do so?
As the UK faces a potential 5B-litre daily water shortfall by 2050, the water sector must turn climate anxiety into operational readiness. Here is how.
My response to the Workforce Challenge panel — Infrastructure Summit, County Hall, London.
Adam Cave from Murray McIntosh shares his thoughts on the UK water sector not having enough engineers to deliver AMP8. Drawing on 12 years of recruitment experience, he unpacks the structural workforce crisis that a recent panel discussion didn't fully confront.
The UK water sector faces a critical white-collar engineering shortage. Retraining won't fix it. The salary gap is structural. AMP8 is at risk.
